OUR PROJECTS

Commercial

Central Square, Leeds

250,000sq ft mixed use retail, leisure & office development in the heart of Leeds.

Cadmic lead the MEP co-ordination from RIBA stage 2 through to stage 6 up to practical completion & handover. We were a key part of the design team nominated for an industry award for BIM innovation 2016.

Working to Level 2 BIM, single discipline 3D models were collaborated & federated. Co-ordination & drawing production using Fabrication CADmep.

2D MEP working drawings and builderswork details were produced for the design & installation of the MEP services.

Wellington Place 7 & 8, Leeds

378, 000sq ft Government Hub for HMRC and NHS Digital, serving 6,000 public servants.

Cadmic were initially appointed to assist in the CAT A shell & core phase of the build, ensuring clash free MEP BIM models were produced, along with stage 5 working drawings in Revit.

Cadmic were further appointed to the then lead the CAT B fit-out phase. This involved LOD 400 BIM models for all MEP services, alongside Revit schedules and material / quantity take-offs direct from the model.

We also lead the periodic clash detection meetings and produced reports for our client.

A-Safe HQ Extension, Elland

Cadmic were appointed to produce a Stage 3 MEP BIM model within a tight deadline for tendering purposes.

This included co-ordination of MEP services in an existing building and new extension.

Modelled in Revit (LOD 300). Services included HVAC, domestic water, above ground drainage, power, lighting, fire alarm and access control.