OUR PROJECTS

Healthcare

University Medical Center, New Orleans

$700m, 424 bed university hospital bringing state of the art healthcare and medical education to the state of Louisiana.

Level 2 BIM – 3D MEP co-ordination (LOD 400) for manufacture & contractor installation. High quantities of prefabricated items including over 800 prefabricated service modules and over 40 bathroom POD types spanning 3 separate buildings.

Nemours / Alfred I Dupont Children's Hospital, Orlando

7 storey 630,000sq ft children’s hospital expansion.

Working on the 95 patient rooms, operating theatres, labs & pharmacy, Cadmic delivered 3D MEP co-ordination at the highest level of detail for contractor installation (LOD 500). Off-site prefabricated modules were designed & co-ordinated, containing MEP services reducing programme time & material costs on site.

Navisworks clash detection, visual fly-throughs & reports, along with remote client co-ordination workshops, led to a streamlined & cost-effective installation.

Royal London Hospital COVID-19 ITU Wards

12 new ITU wards for NHS St Barts Trust within Royal London Hospital specifically for emergency Covid-19.

Cadmic were part of a dedicated team of industry experts working 24/7 to reduce the critical design and construction programme from 20 weeks to just 6 weeks.

Fully detailed 2D layouts for full MEP installation, including HVAC, potable and softened water, medical gases, power, data and lighting. Co-ordinated ceiling plans, detailed elevation and setting out layouts were also produced to assist with installation.

Kings Mill Hospital, Nottingham

New 860 bed acute hospital for Mansfield District Primary Care Trust.

This project included services which formed part of the largest geothermal lake loop in Europe to provide heating and cooling. Cadmic were involved with the 2D MEP co-ordination to produce over 300 floor plans, section, elevations and detail sketches.