OUR PROJECTS

Industrial

Dairy Crest Facility, Davidstow

£65m re-development of demineralised whey powder production for Dairy Crest. This project spanned over 7 separate buildings with connected MEP services & Process Engineering pipework.

Cadmic were responsible for the 3D co-ordination & clash detection, including steelwork framing & bracketry. Periodic on-site assistance, including measured surveys and client 3D model reviews with clash reporting.

Mechanical, Electrical & Process Engineering services including HVAC, steam pipework, condensate, cooling water, LPHW, MCWS, compressed air & towns water modelled using Fabrication CADmep.

Patheon Flexion Facility, Swindow

Upgrade existing mechanical services to facilitate expansion of Speciality Pharma Solutions.

Cadmic were appointed to assist in producing fully dimensioned drawings for pipework and ductwork. This project involved using a combination of Revit and AutoCAD to create installation level drawings.